GM Claims Project

3D IP Survey on the GM Claims Project (South Portion)

Shown on the map below are some preliminary results of
the IP testing, outlining mineralization shown as
chargeability>8ms in dark green and
chargeability>6ms in lighter green.
(See further details below the map)

Induced Polarisation Testing

2008 3D IP Survey on the GM Claims Project (South Portion)

>

To the right is a side view of the geological structures outlined on the map above showing the 3-D image of chargeability>8ms in dark green and chargeability>6ms in lighter green. This indicates that there is one large pear-shaped structure and several smaller odd-shaped structures under this area which hold the potential for significant mineralization. A rough estimate of possible tonnage contained in this main structure, based upon its physical dimensions and using a weight of two tonnes per cubic metre, would be in the range of 100 to 120 million tonnes.

At this time there is no way to know whether this is economic mineralization containing valuable metals or simply pyrite compounds with no economic value. The exact nature of this mineralization will have to be determined through diamond drilling and assaying, which are planned for the next year.